Pics tomorrow. But I ended up with 4" of #7-8 rocks , 4" of crushed rock, 6 mill plastic, 4" of fiber cement.All packed before laying the cement. Long day and my barracuda got rained on (tarp covered) for the first time since 1975. I am beat. But very happy. Now I have to move the things back in 1 by 1. I called this evening for 2 9x10 roll up doors to be installed. Going to go get a 52" shop fan in the morning and see about some black and white checker board tiles. Still looking for the 4 post lift in an article I had. Can't find it as of yet.
I am quite sure by my wifes looks, she is glad I am easing up on buying stuff.
He he he, chrome bumper from Stevens Performance on monday, she doesn't know were driving up there yet