Thanks Guys. It's looking pretty sweet up close.
I still need to finish the front brake lines and bleed the brakes. Then install the e brake cable.
Connect the rad and heater hoses.
Install the clutch pedal linkage and over center spring and Z bar. Buy and install a bell housing bottom inspection cover.
Install the seat backs, side covers and kick panels.
Fill er up with fluids and run it in. Then get it to a shop for a final front end alignment.
Not to mention a punch list of some touch ups and redos.