Thanks fellas!
The tape stripes would have already been on but they came in flawed. Should see the replacements soon
Interior bits should be done the second week of April. The vinyl top should be done at the same time.
Most ( or maybe some ) of the finishing stuff is here. locks, handles, levers, lenses, etc etc etc. Still have to pick up the emblems for the entire car inside and out. Gotta get the exhaust bought as well.
Gauges should be back fro refurbishing in a couple of weeks.
We are crunching to get done by the 3rd week of June. I'm not sure we are going to make it....still a LOT to do