Howdy,
I have to replace both the rear frame rails and the trunk floor on a '70 'Cuda. Would it be easier to put in the frame rails first, after drilling through the spot welds on the frames? Then I could lay in the trunk floor and from the bottom of the car, mark the holes for the spot welds through the frame onto the trunk floor.
Also, how can I do this on some sort of a roitisserie system? I can't attach a roitisserie the normal way to the frame, obviously.
With a MIG welder, do I need to lay in a beam when putting in the frames, or should I tack weld the frames like I would quarter panel skins and the trunk floor?
Thanks!