There was a post last fall about the winter "todo" list. How's everyone making out? I'm not doing real well on shortening the list - in fact it has got longer. I'll wait until late March to get going (once the basement is done!)
Install new door handles; a little more wet sanding polishing and glazing; install washer bottle; frame connectors (I doubt it); retorque head gaskets; retorque mains(long story), rechrome signal bezels (sent out already), adjust side glass, polish rear and side glass, fit rear door panels screws (aftermarket panel screw holes aren't quite right), get front end checked out - install new control arm bushings and front sway bar bushings at minimum, wire up Line Loc, install header bungs for Innovate air/fuel sensors, install new Grant "Tuff" steering wheel (if it ever arrives!)