I cant recall what I said..But..
My truck's done for now. I still need to replace the rear section of frame rail, but it's plowing and doing dump runs in decent shape now.
The '68 (customer) Barracuda notchback is about ready for it's etching primer. it's all bare steel, some bugs still to fix..Like drip rail in trunk and some trim holes we dont need. But it's coming along.
The 505ci stroker is coming together now. I'm installing pistons/rods, all clearancing is done. Still need to order pushrods, but I have to ge the top end on first. Should be at that point by the end of this week.
The 451 RB (my experiment) short is donee, heads are to be flowed this week (ported 452s) and milled, so the top end can get on it. Then it's the running stand for both engines, and the dyno for the 451.
8 3/4 for customer is done, awaiting final $quaring up and shipment.
The block for my Swinger is supposed to go to the shop this Saturday. But time and finances may change that plan. It's still way early in the project anyway.