Wow, lots of catching up to do here. Oh well. I'll put some pics up that were gone.
I put the bed on to see where I wanted to fill it. Once I figured that out, I welded the neck on, and welded the pump studs on. I got some tank sealer yesterday. All I have left to do is make a sending unit hole, and then I can seal and paint it. Once that gets done, I can install the fuel system. That much closer to start-up.
Scott, I will re-send you a PM, since I'm sure its gone. Will that fuel setup work? And my fancy line I drew where the line will go?