The final coat of Rust Bullet may be topcoated after 24 hours with almost any paint if a different color is needed or desired. Cure time varies based on relative humidity and temperature of the surface: 80% in 4 hours, fully cured in 72 hours. When applying Rust Bullet, it is recommended that the air or surface temperature not be below 35oF (2°C) or above 110°F (43°C). Ideal application temperature is between 50°F (10°C) and 80°F (27°C) with humidity below 90% to ensure proper drying. Do not apply to surfaces when the existing temperature of the surface exceeds 150°F (66°C) or is below 32°F (0°C). After curing, Rust Bullet has a service temperature range of 314°F (157°C) continuous, and can tolerate temperature spikes of up to 700°F (371°C) for up to 24 hour periods. Immediately after use, spray equipment must be cleaned with xylene, acetone, or toluene.