Author Topic: build date from vehicle order number ?  (Read 606 times)

Offline Tropicalcats

  • Resident
  • *****
  • Posts: 3488
  • Don't Ever, Ever Give Up
build date from vehicle order number ?
« on: April 05, 2009 - 05:54:39 PM »
Can you tell the expected build date on a car from the vehicle order number and if so what does 106 040693 mean?

1970 Challenger R/T 383  Matching#s JS23N0E under construction. It's Plum Crazy
SOLD




Alaskan_TA

  • Guest
Re: build date from vehicle order number ?
« Reply #1 on: April 05, 2009 - 07:02:23 PM »
106 is the SPD - Scheduled Production Date - January 6th.

The SPD is the date they HOPED to build the car when the order first entered the system, it could have actually been made before or after the SPD.

As an example, my T/A has an SPD of 417, but the engine final assembly date is 422. So my car was built late, well after the SPD.

Offline Tropicalcats

  • Resident
  • *****
  • Posts: 3488
  • Don't Ever, Ever Give Up
Re: build date from vehicle order number ?
« Reply #2 on: April 05, 2009 - 07:31:32 PM »
Thanks Barry
1970 Challenger R/T 383  Matching#s JS23N0E under construction. It's Plum Crazy
SOLD

Alaskan_TA

  • Guest
Re: build date from vehicle order number ?
« Reply #3 on: April 05, 2009 - 07:33:59 PM »
If you find any date codes on your original parts after your SPD let me know will ya?  :thumbsup:

Offline Tropicalcats

  • Resident
  • *****
  • Posts: 3488
  • Don't Ever, Ever Give Up
Re: build date from vehicle order number ?
« Reply #4 on: April 05, 2009 - 07:58:16 PM »
So far just the wiper motor. I will keep you posted
1970 Challenger R/T 383  Matching#s JS23N0E under construction. It's Plum Crazy
SOLD