no no no no no.... when you weld up a predrilled hole, that is a plug weld
when you weld two pieces of sheetmetal together (side by side), that is a butt weld. (the edges are butted up next to each other)
when you have a long strip to weld, you weld one inch,skip one inch weld one inch... until you're done this is stitch welding
A complete weld can make the joint weak, especially with sheetmetal, thats why the stitch weld.
And I don't think not understanding something makes for a stupid question.
Doing something without understanding it makes for a stupid outcome.