8 Month UPDATE....
About 1/2 way done with the shop now and the outside is ready for paint. I'll be installing the 14' x 16' garage door next week and then I can turn my attention to doing some interior wiring until the weather gets a little nicer outside. In a couple months I'll paint the outside, pour the driveway along with some stamped concrete, stone BBQ and a big outdoor propane fireplace. Then I'll put stone on the lower 3' of the stem wall below the siding and be done with all the outside stuff.
Next winter I'll work on the inside.