Work completed week ending 4-3-05

Author Topic: Work completed week ending 4-3-05  (Read 1980 times)

Offline 360 'CUDA

  • Sr. Resident
  • ******
  • Posts: 5784
Re: Work completed week ending 4-3-05
« Reply #15 on: April 03, 2005 - 10:11:57 PM »
Put some new front shocks on the '74 'cause the thing was shaken alittle on the freeway ::)

Still shakes but alot less... I might have a front tire going away or just out of balance

The Arizona sun has been beating on my oct 1997 paint job and I have some oxidation on the hood and
roof so I took some 2000 grit sandpaper to the hood to clean it up....works great ;)

hit it with some turtle wax polish and then some clay  with a tutle wax chaser :thumbs:

The hood looks way better but it could use alittle more work




Btch n Blue

  • Guest
Re: Work completed week ending 4-3-05
« Reply #16 on: April 03, 2005 - 10:39:14 PM »
Since it's still April 3rd... I guess this applies....

 :fire:The B*tch 'N Blue RUNS!! :fire:

That's right... at about 8:30ish (or somewhere around there) she sputtered and coughed to life, the quickly died out with a puff of flame out the carb... STRIKE 1....

After a little readjustment on the timing and making sure everything was still in order (as well as oil and tach gauges working), she cranked, spit and roared to life at about 3000 rpm.... quickly adjusting timing while she was running... there was some popping out the exhaust from the solid rockers being out of adjustment just a little... but she was running... for about 30 seconds.... STRIKE 2...

After discovering coolant leaks from 3 bolts on the intake/exhaust maninfolds, the bypass hose on the water pump and one heater hose line, we shut her down... some disassembly happened and major tightening and double checking over everything occurred... by the time everything was checked, it was noted that the clock read 10:30, so, unfortunately, no possibliity for strike 3 today...

However... tomorrow... she shall be officially broken in and tuned... UPDATES to follow!! :burnout:

Offline Street_Challenged73

  • Sr. Resident
  • ******
  • Posts: 8826
  • '73 FC-7 Challenger..Member since October 20, 2002
    • My '73 Challenger Restoration Page
Re: Work completed week ending 4-3-05
« Reply #17 on: April 03, 2005 - 10:53:35 PM »
SWEEEEEET!!!!!!! :grinyes:
1973 Dodge Challenger......................The ongoing project. (00/----\00)
1991 Dodge Stealth R/T Twin-Turbo....The sunny day cruiser (RTBoost)
1990 Toyota Celica GT Liftback...........The new daily & winter driver.
All-American Muscle: 'Cudas and Challengers...Still the Elite and always will be.

                                                                                             
                 
Street_Challenged73 from Wisconsin

Offline 360 'CUDA

  • Sr. Resident
  • ******
  • Posts: 5784
Re: Work completed week ending 4-3-05
« Reply #18 on: April 03, 2005 - 11:14:22 PM »
The leaning tower of power is alive :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer:
 :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer: :beer:
 :beer: :beer: :beer: :beer: :beer: :beer: :wasted:

Life is good

RedLine

  • Guest
Rev-it-up and Redline make progress on Challenger
« Reply #19 on: April 03, 2005 - 11:16:33 PM »
Congrats Mike on your progress!   We are not far behind!   

This weekend we continued to work our plan...finished more electrical systems, got the high beam switch installed, the passenger kick panels are now in.  Speedo cable is in.  neutral safety harness came in so we installed that.  Fuel system finished.  Then we worked on Brakes. bled the brakes and tested stopping wheels.  They lock right up! Emergency brakes now working.  The "Brake" light now comes on when emergency is on. yeah!  Had to remake the stainless steel line shown below... it was leaking-  bad flare.
« Last Edit: April 04, 2005 - 10:24:44 AM by RedLine »

RedLine

  • Guest
Re: Work completed week ending 4-3-05
« Reply #20 on: April 03, 2005 - 11:16:54 PM »
Then....  turned to the throttle and kickdown.  Got our Lokar systems, and with a little re-engineering, got our systems working.  here are some pics:
« Last Edit: April 03, 2005 - 11:20:24 PM by RedLine »

RedLine

  • Guest
Re: Work completed week ending 4-3-05
« Reply #21 on: April 03, 2005 - 11:20:59 PM »
Also... Worked on the front valence a little.... got the lights repainted and installed the brackets and lights....
« Last Edit: April 03, 2005 - 11:23:22 PM by RedLine »

Offline Street_Challenged73

  • Sr. Resident
  • ******
  • Posts: 8826
  • '73 FC-7 Challenger..Member since October 20, 2002
    • My '73 Challenger Restoration Page
Re: Work completed week ending 4-3-05
« Reply #22 on: April 03, 2005 - 11:23:46 PM »
That's great, Redline!!!!!  In no time you'll be able to do this.  :driving: &  :burnout:  :grinyes: :grinyes:
1973 Dodge Challenger......................The ongoing project. (00/----\00)
1991 Dodge Stealth R/T Twin-Turbo....The sunny day cruiser (RTBoost)
1990 Toyota Celica GT Liftback...........The new daily & winter driver.
All-American Muscle: 'Cudas and Challengers...Still the Elite and always will be.

                                                                                             
                 
Street_Challenged73 from Wisconsin

Offline Carlwalski

  • C-C.com Expert
  • ********
  • Posts: 20672
Re: Work completed week ending 4-3-05
« Reply #23 on: April 04, 2005 - 12:58:36 AM »
Awesome stuff everyone!!

Good for you Mike can't wait to see this slanted beast!

And Redline/REV lucky barstards!!  :laughing: I can't wait to be at your stage.  :newsad:
1970 Dodge Challenger R/T
White, License Plate, 0A-5599
540ci Aluminium Hemi, F.A.S.T EFI
TF-727 Gear Vendor OD, Dana 60

Offline Screwy Squirrel

  • Jr. Member
  • **
  • Posts: 146
    • Those guys think I'm crazy.  And I am too!!!
Re: Work completed week ending 4-3-05
« Reply #24 on: April 04, 2005 - 02:54:39 AM »
congrats everyone  :beer:  looking good all  :patriot:  keep it up,  carlisle is comming!!!   :thumbs:

April did some painting detail in the engine compartment. should be reinstalling the wiper motor tomorrow.....I mean today

Offline Mopar73340

  • Sr. Member
  • ****
  • Posts: 1130
Re: Work completed week ending 4-3-05
« Reply #25 on: April 04, 2005 - 09:18:48 AM »
Great work everyone!!!!   :thumbs:
73-Challenger 340 727/GearVendors Auto
73-Challenger 408 Pistol-Grip 5-speed

Offline whitesatinmopar

  • Sr. Resident
  • ******
  • Posts: 7273
  • Member Since 3/30/02
Re: Work completed week ending 4-3-05
« Reply #26 on: April 04, 2005 - 04:28:15 PM »
Great work to all of you, I feel like the tortoise as far as the runner project goes, slowly but surely. If I just had a couple better eyes, and a couple quicker hands, and a couple more brains, and a couple less  :beer:, I'd probably be done, oh well, I'm having a ball, me and my honey will prevail. Beleive me when that gal fires off I'll let you know, but don't hold your breath,lol.   :thumbs:  :wave:
1969 Polara 500 vert.
1970 Charger 500
1971 Dart Swinger
1972 R/R 440+6 (wanabe)
1973 Challenger

Offline AprilsPink72Cuda

  • Global Moderator
  • Resident
  • *****
  • Posts: 4783
  • 1972 'Cuda 340/Wappingers Falls, NY
    • Klondike's Website (Check it out!)
Re: Work completed week ending 4-3-05
« Reply #27 on: April 04, 2005 - 04:38:03 PM »
Great work Mike and Rev/Redline!  So much progress!!!!!!  I love it!