In front of the K frame bolt holes you'll find two holes in the frame rails. I simply hook (rubber coated) my nylon straps in those holes hooked to my engine hoist. Lift it up nice and high, and roll the assembly underneath and lower away.
Once lowered, line up the holes and bolt in the K Frame. jack the tranny in place and bolt the crossmember in.
You should have the engine/tranny combo complete as possible, all hoses, wiring etc...you should have the engine compartment complete as well with brake lines, wiper motor etc...
My last picture shows there is not much left to do leaning over the fenders...install the rad, hook up some hoses and wiring and you're done.
The installation process takes me about 20 mins.